SERVICES

● Consulting

● Negotiation

● Management

● Construction &      Maintenance

       (C&M)

   Agreements

● Legal Document

   Creation and

   Review

Widen State Route 91 

Riverside County Transportation Commission (RCTC)

​Corona, CA.
Worked with Riverside County Transportation Commission with the drafting of Tri Party Agreements between BNSF, CALTRANS and RCTC providing for the construction of projects over BNSF’s Rail Corridor involving the widening of existing overpass bridges and the construction of new connector ramps at four locations East Porphyry, West Porphyry, East Prado, and West Prado for State Route 91. Drafted three other agreements required for this large Project, West Porphyry Termination Agreement, Porphyry Yard Track Agreement, and the Temescal Wash Agreement.

STATE OF COLORADO

STATE OF NEW MEXICO

STATE OF ARIZONA

We wrote the agreement that covered the portion of the Redondo Jct Flyover project that was located on BNSF property.

Placentia Avenue October 2014, Placentia, CA

Looking west at the Shaw Avenue – Marks Avenue grade separation in Fresno, California.

• Albuquerque – I-40 Reconstruction
• Belen – Renkin Grade Separation

Alameda Corridor Rail Cargo Expressway
Alameda Corridor Transportation Authority (ACTA)
Los Angeles to Long Beach, CA

I-215 Widening Project
San Bernardino Associated Governments (SANBAG)
San Bernardino, CA 

Worked with San Bernardino Associated Governments (SANBAG) to complete tri-party C&M agreements between BNSF, State of California, and SANBAG for freeway or local street overpasses at eight locations: the Redlands Loop; Fifth, Ninth, 16th and Baseline streets for the I-215 widening project.​

Bridge Program-Grade Separation Projects 
Orange County Transportation Authority (OCTA)

​Orange County, CA. 
Worked with Orange County Transportation Authority on seven grade separation projects over or under BNSF’s Rail Corridor in the cities of Anaheim, Placentia and Fullerton, CA.  completing Tri Party Construction and Maintenance Agreements for Placentia Avenue,  Kraemer Boulevard, Tustin Avenue-Rose Drive and Orangethorpe Avenue, Lakeview Avenue,  State College Boulevard, and Raymond Avenue.​

I-210 - I-215 Interchange
San Bernardino Associated Governments (SANBAG)
San Bernardino, CA
Worked with San Bernardino Associated Governments (SANBAG) to complete tri-party C&M agreements between BNSF, State of California, and SANBAG to add ramps to the existing Cajon Overpass to accommodate movement from I-210 to I-215.

• Sun City – Estrella Freeway Grade Separation

CALL US

(714) 524-9793 Office

(714) 307-6311 Cell

A Google Earth overview of the Shaw Avenue – Marks Avenue Grade Separation in Fresno, California

PAST PROJECTS

Below is a list of our past projects:

Over 60 years of experience

Past Work Locations

Photo Kraemer Boulevard Grade Sep Render, Placentia, CA

Looking north at the Shaw Avenue – Marks Avenue grade separation in Fresno, California

United States of America

STATE OF CALIFORNIA

Copyright 2019  ●  Railroad Public Projects  ●  All rights reserved

Railroad Liaison with the Alameda Corridor Transportation Authority (ACTA) to manage the negotiations between railroads, cities and other stakeholders. Wrote the C&M agreement for the Redondo Jct. Flyover Project that grade-separated the BNSF main tracks from other rail traffic along the Los Angeles River rail corridor.

BNSF Representative. Served as one of the BNSF Railway’s representatives during the process of negotiating and managing the agreements for pedestrian overhead crossing structures at three Metrolink stations: Riverside-Downtown, La Sierra and North Main Corona.


• Corona – East Porphyry Overpass
• Corona – West Porphyry Overpass
• Corona – West Porphyry Termination 
• Corona – East Prado Overpass
• Corona – West Prado Overpass
• Corona – Temescal Wash 
• Corona – Porphyry Track 
• Fullerton – Raymond Avenue Underpass
• Fullerton – State College Boulevard Underpass
• Placentia – Placentia Avenue Underpass
• Placentia – Kraemer Boulevard Underpass
• Placentia – Orangethorpe Avenue Overpass
• Placentia –  Tustin Avenue-Rose Drive Overpass
• Lakeview Avenue - Overpass
• San Bernardino - Palm Ave. Overpass 
• Buena Park – Dale Street Grade Separation
• Fullerton – Highland Avenue Grade Separation
• Fullerton – Passenger Station Pedestrian Overpass
• Fullerton – Widening of Lemon St. and Harbor Blvd. Underpasses
• Commerce – Retrofit of the Long Beach Freeway 710 over BNSF’s main tracks and Hobart Yard
• Commerce – Telegraph Road Grade Separation
• Santa Ana – I-5 Grade Separation
• Riverside – Arlington Avenue
• Riverside – Passenger Station Pedestrian Overpass
• Corona – Passenger Station Pedestrian Overpass
• Corona – Corps of Engineers Oak Street Drain
• Martinez – Route 4 Christie Overpass (Tri-Party Agreement State, County and Railroad)
• Pico Rivera – Corps of Engineers Rio Hondo Improvement Project (Prepared initial draft)
• Bakersfield – Passenger Station Track Infrastructure
• Fresno – Shaw Avenue – Marks Avenue Grade Separations
• Stockton – Mariposa and Jack Tone Road Grade Separations
• Richmond – Enterprise Road Grade Separation
• Richmond – Richmond Parkway
• Ports of Long Beach and LA – Alameda Corridor Project (wrote original drafts)
• State of California Capacity upgrade projects on various BNSF lines

• Denver – Rapid Transit District Southerly line extension
• Littelton – County Line Road Grade Separation

RCTC Metrolink Commuter Rail Pedestrian Overpasses

Metrolink

Riverside and Corona, CA